 | CAD Specialist rendering of the Interlocking Tower. |
 | The inside of the small door on the interlocking tower. |
 | The outside of the small door on the interlocking tower. |
 | The same door with an added reference. The girl is 4 years old. She helps to put the project in scale. |
 | Installing the roofing. |
 | View of the upper level door from just inside the door. |
 | The view out the front, upper windows as seen from the lower level just inside the door. |
 | The first in a series. The tower is framed up, the upper door is installed, and the tar paper is being installed on the roof. |
 | The second picture in the series. The roof is nearing completion. |
 | The third picture of the series. The windows have been installed and a stairway stringer has been put in place to check for fit. |
 | The fourth picture in the series. Stairs are installed and the siding is almost completed as well. |
 | This is what the tower would look like if it were full size (or you were 5/12 scale!). |
 | The view from the bottom of the stairway. |